Retain Staff. MAINTAIN SCHOOLS. Educate Students.
The proposed referendums focus on addressing operational, educational, and deferred maintenance priorities across the District, with updates proposed for our Primary, Intermediate, and High school facilities.
aTTRACT & Retain Quality Staff
Maintain day-to-day operations over the next four years.
Attract and retain quality staff, and prevent the loss of 5.5 critical positions that will otherwise need to be reduced.
SAFETY, SECURITY, ACCESSIBILITY
Add emergency generators, security cameras, and door card access.
Improve parking and parent/bus traffic flow.
Update building interiors and exteriors to meet ADA requirements, including bathrooms, sidewalks, curbs, and parking lots.
LEARNING SPACES
Upgrade technical education spaces and infrastructure (welding, construction, autos, agriculture).
Update auditorium lighting, audio, video, and stage.
Repair sinking foundation beneath kindergarten classroom.
Improve support spaces (kitchen, loading dock, office spaces).
Replace outdated classroom furniture.
Improve internet infrastructure.
REPAIRS & ENERGY EFFICIENCY
Upgrade heating systems, lighting, piping, and electrical infrastructure.
Replace priority roofing (RCHS), flooring, ceilings, windows, doors, casework, and bathrooms.
Add air conditioning (RCPS & RCIS).
TOTAL COST of Proposed Facility Improvements IS $27,160,000:
$6,229,600 - Safety & Security
Electrical Infrastructure Upgrades
Emergency Generator Addition (PS & IS)
Internet Infrastructure Upgrades
Card Access Replacement
Camera Additions
Repair Sinking Kindergarten Floor/Structure (PS)
Parking Lot Improvements - Parent/Bus Pick-up Drop-off (PS & IS)
Office Revisions (IS & HS)
$2,258,400 - Accessibility/ADA
Sidewalk & Curb Repair
Toilet Room Upgrades
Art Room Casework & ADA Sinks (PS)
Music Room Updates - ADA Compliance (IS)
Special Education Remodeling (IS)
Asphalt Path ADA Compliance (HS)
$390,200 - Technical Education (HS)
Construction Lab - Spray Booth Expansion/Ventilation
Auto Lab - Exhaust, Lifts, Shelving, Storage, Tables
Welding - Relocate Welding Booths and Expand Quantity
$6,882,500 - Air Conditioning
Air Handling Unit Replacements (PS & IS)
Air Conditioning Addition (PS & IS)
Data Room Cooling (PS & HS)
$2,374,200 - Indoor Air Quality & Energy Efficiency
Heating System Upgrades & Retro-Commissioning
LED Lighting & Controls
Window Replacements (PS & IS)
Kitchen Expansion & Milk Cooler Ventilation
Exterior Door Replacement (IS)
$5,170,100 - Deferred Maintenance
Asphalt Replacement & Loading Dock Repair
High Priority Ceilings, Flooring, & Finishes
Furniture Updates
Galvanized Piping Replacement (IS)
Stairwell Repair (IS)
Science Exhaust Fan Replacement & Welding Hood Exhaust Improvements (HS)
Roofing Replacement - Center Section (HS)
$1,973,300 - Auditorium
Auditorium Updates - Lighting, Audio, Video, Curtains/Rigging, & Stage Deck
$1,881,700 - Inflation/Design Allowance